
Energy · Industrial development
Last-Mile Industrial and Logistics Park — Fortín de Piedra
A 270-hectare site adjacent to Tecpetrol's shale field, where the operations of Vaca Muerta's main players converge.
Stage 1 — Multi-logistics platform
An integrated platform tied to drilling and production services, given its strategic position in the last-mile area where the fields of Pan American Energy, Pluspetrol, YPF, ExxonMobil and other operators converge. It includes import, storage and distribution of oil industry supplies over 330,000 m².
Stage 2 — Industrial park
Phased development of the infrastructure required by the hydrocarbon sector over 2,370,000 m², enabling local SMEs to establish and relocate strategically to provide services and add local value.
Featured projects
Other projects

New terminal at the Port of Bahía Blanca
A new terminal on 25 hectares with river access, developed together with engineering and construction firms specialised in port infrastructure.
View project →
Neuquén Airport cargo terminal
Financing, construction and operation of the air cargo terminal at Neuquén International Airport, together with Patagon Energy and Rhenus Logistics.
View project →
Integrated Logistics Vaca Muerta – Asia Pacific
A logistics scheme connecting the heart of Vaca Muerta with Chilean Pacific ports and Asian markets, supplying the oil and gas industry on time.
View project →
Do you have a mining, energy or logistics project?
We work from the idea to the permit: structuring, engineering, approvals, partners and investors.